· Validate the adhesion of the adhesive to the actual bonding substrate and the aging resistance of the joint
· Validate if the bonded parts can meet the design expectations under the actual production conditions, especially with extreme process parameters
· Process verification during the production process for bonding projects that have completed joint design
· Prototype testing of new products or old products transferred to factory for production
· After formal production, if there are major changes in structure, materials, and processes that may affect product quality and performance, process evaluation will be arranged
· After a product has been out of production for a long time, process assessment will be arranged when production is resumed
+86 0519-86883518
10th Floor, Building 08B, Qishuyan Rail Transit Industrial Park, No. 355 Longjin Road, Economic Development Zone, Changzhou City, Jiangsu Province, China
Scan now
Follow us
Copyright © 2020-2024 Yifa Adhesive and Composite Training Center All rights reserved
Website Build:Shenmeng Network.Sitemap.TXT Map