a) Provide process assessment during the production process for bonding projects that have completed joint design.
b) Trial prototype testing of new products or old products transferred to the factory for production.
c) After formal production, if there are major changes in structure, materials, and processes that may affect product quality and performance, process evaluation will be arranged.
d) After a product has been out of production for a long time, process assessment will be arranged when production is resumed.
+86 0519-86883518
10th Floor, Building 08B, Qishuyan Rail Transit Industrial Park, No. 355 Longjin Road, Economic Development Zone, Changzhou City, Jiangsu Province, China
Scan now
Follow us
Copyright © 2020-2024 Yifa Adhesive and Composite Training Center All rights reserved
Website Build:Shenmeng Network.Sitemap.TXT Map